top of page
772.png

GEOHAZARDS TEAM LEAD

2016-2018

Brunei Shell Petroleum

Brunei Darussalam

PERSONAL ACHIEVEMENTS

  • Established a new team: new workflows to ensure process safety requirements are met.

​

  • Cost savings: When technically supported, championed efforts to slim well designs and drilling practices (e.g., suppress pilot hole for top-hole section).

​

  • Promoted 3D reprocessing to complement 2DHiRes (HiDef, DECON3, SWIM).

​

  • Smooth collaboration between departments and across organizational boundaries.

​

  • Coach of the Year Award. Voted by local young talent.

Coach_of_the_Year_Award_Brunei_Shell_Pet

TEAM ACHIEVEMENTS

  • Coordinated 2D HiRes seismic, debris surveys and soil boring acquisition campaigns. Input to optimize timing for data acquisition (what is needed by when) as well as what the data requirements are (i.e., survey design and technical specifications).

​

  • Co-created a data base of all well data, logs, mudlogs, drilling parameters, reservoir and annulus pressures to shorten lead time for Geohazards assessments.

​

  • 75 integrated assessments of drilling hazards using seismic data (3D/2D/ 2DHR, incl. time lapse effects), logs, mudlogs, drilling parameters, reservoir and annulus pressures.

​

  • ~50% well trajectories and / or casing designs modified or steered by the team.

bottom of page